Case Studies/Financial Services
Informix to Oracle Migration for a Leading US Bank

Informix to Oracle Migration for a Leading US Bank

Leading US Regional BankUnited States12 months
Zero
Data loss
40%
Performance gain
100%
Schema converted
<2 hrs
Cutover window
Case study highlights

At a glance —
the essentials.

The Customer

Leading US Regional Bank

Industry: Financial ServicesRegion: United StatesDuration: 12 months
Database MigrationApplication RefactoringPerformance Tuning
Business Challenge
  • The bank's core lending application ran on an aging Informix database with limited vendor support, growing license risk, and performance ceilings that were beginning to constrain product launches.
  • Decades of Informix-specific stored procedures, ESQL/C code, and proprietary data types meant a naive migration would break dozens of integrated systems.
Our Solution
  • Kumaran built an automated schema and PL/SQL conversion toolkit calibrated to the bank's coding patterns, achieving high-fidelity translation of stored procedures, triggers, and packages.
  • Application code was systematically refactored to Oracle JDBC, with a regression suite generated from production traces to validate behavior end-to-end.
  • Oracle GoldenGate provided real-time replication during a parallel-run period, enabling a sub-two-hour final cutover with full rollback capability.
Key Results
  • 100% of the schema and stored logic was successfully converted with zero data loss across the cutover window.
  • Average query response improved by 40% on the new Oracle 19c platform, with headroom to support the next decade of growth.
  • License and support risk was eliminated, and the bank's database team gained a modern foundation for analytics and AI initiatives.
By the numbers
Zero
Data loss
40%
Performance gain
100%
Schema converted
<2 hrs
Cutover window
Get the full case study

Go deeper —
download the PDF.

The downloadable report includes the complete technical narrative beyond the highlights above:

  • Platform Specifications Hardware, OS, runtime environment, and infrastructure topology — including detailed configuration of the source and target platforms.
  • Architecture Diagrams Before-and-after system topology, data flows, integration patterns, and component interaction maps from the production deployment.
  • Project Scope Workstreams, team structure, governance model, RACI matrix, and the phased delivery plan that kept stakeholders aligned.
  • Migration Methodology Phased cutover plan, parallel-run validation harness, automated regression strategy, and rollback playbook used to de-risk production changes.
  • Performance Engineering Bottleneck analysis, tuning techniques, and benchmarking results that drove the measured efficiency gains.
  • Lessons Learned What worked, what we'd do differently, and the reusable patterns we now apply to similar modernization programs.
Get the full case study

Download the PDF

Full breakdown — challenge, approach, results & metrics.

We respect your inbox. No spam, ever.